8 Weeks.
Design to Delivery.

Every step is structured, documented, and visible. No surprises. No uncertainty. The material that leaves the factory is the material that arrives at your door.

Photo DocumentationDDP Shipping IncludedFounder Direct Access3 Year Warranty

The Journey

Every Week. Accounted For.

Week 1

Design & Approval

Share photos of your space. Receive design concepts within 48 hours. Approve your final design through our visualization system.

Design Locked
Week 2

Specification

Your approved design is translated into full manufacturing specifications. Every dimension, finish, and hardware selection is confirmed.

Specs Finalized
Week 3 to 4

Manufacturing

Your materials enter production at our premium Asian manufacturing facilities. Photo documentation at each critical stage.

Factory Photos Sent
Week 5

Quality Inspection

Completed materials undergo multi point quality inspection. Any issues resolved before packing. Final photos sent for your approval.

QC Approved
Week 6

Shipping & Transit

Materials are packed, containerized, and shipped DDP (Delivered Duty Paid). You receive port of loading confirmation and tracking.

In Transit
Week 7

Delivery

Materials arrive at your project site. Unboxing inspection with photo documentation. Installation preparation begins.

Delivered
Week 8

Installation

Professional installation support available. Chief installer hotline throughout. Final walkthrough and documentation.

Complete

You See Everything We See.

Factory Floor

Factory Floor

Master craftsman atelier. Suzhou, China.

Every material is inspected before it ships.

Quality Check

Quality Check

Pre shipment inspection bay.

Deviations are rejected, not negotiated.

Port of Loading

Port of Loading

Shanghai container terminal.

One crate. One chain of custody. Your name on it.

Delivery

Delivery

Job site arrival, Delivered Duty Paid.

The material that left the factory is the material that arrives.

KOVAIRE workshop

No Warehouse. No Substitution.

Manufacturer
to Your Door.

KOVAIRE materials ship directly from the factory to your project site under a Delivered Duty Paid model. There is no consolidation warehouse. The chain of custody is documented end to end.